• Hunan Heou Engineering Consulting Co., Ltd
    Marshall Law
    Thank you for helping us to complete our lightning protection grounding work, our wind power project found several lightning protection companies can not complete, your flexible grounding body is really amazing, thanks again!" .
  • Hunan Heou Engineering Consulting Co., Ltd
    john wick
    Thank you for your assistance in completing the tower lightning protection project. Your company's service is very considerate and technologically advanced, especially the flexible grounding body earthing project, which greatly reduces our cost and time, and I hope to have the opportunity to cooperate again.
Contact Person : cody
Phone Number : 86-17349642793
Whatsapp : +8617349642793

Flexible Lighting Protection System

Place of Origin China
Brand Name HAMMOND
Certification ISO9001
Model Number HD-R10Y
Minimum Order Quantity Negotiable
Price Negotiable
Delivery Time 8 days
Payment Terms L/C, T/T
Supply Ability 1000

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Product Name Flexible Grounding Electrode Material Flexible Material
Function Lighting Protection Product Keywords Blocking Agent,Flexible Grounding Body,Resistance Reduction Materials
CERTIFICATE ISO9001 / CE Weight 1kg
High Light

ISO9001 Flexible Lighting Protection System

,

Blocking Agent Flexible Lighting Protection System

,

Flexible Grounding Electrode 1kg

Leave a Message
Product Description
Resistance Reduction Flexible Lighting Protection System With CE Approval
 
 
 
Construction of flexible grounding body
(1) Flexible grounding body is a kind of compound formula product. It includes:
conductive agent, preservative, blending agent, flexibility agent, channel agent,
coagulant, catalyst, etc.
 
(2) First dig the grounding trench, weld the horizontal grounding body, and the
vertical grounding electrode.
 
(3) Open the lid of the barrel and take off the two bags of raw materials stuck to
the inner lid.
 
(4) Open the plastic bag and turn the plastic bag over to the outside of the
barrel with a wooden stick into the barrel to stir the sediment and liquid. (When the
temperature is low, you should use a heating rod to warm up the liquid in the barrel
to about 30 degrees)
 
(5) Open the two external bags of raw materials and add them to the liquid and
stir well, and take them to the edge of the ditch, or the pit, to be used.
 
(6) As vertical pouring can be poured directly.
 
(7) If you do horizontal pouring, you need to keep stirring slowly until the
resistance of the liquid in the barrel increases and becomes sticky like porridge, then
pour it into the trench to wrap the horizontal grounding body and form a long line of
pouring while pouring.
 
(8) wait for its solidification to form with elastic grounding conductor, at this
time will no longer dissolve in water, can be backfilled, the construction of flexible

 

Specification
 
 
 
 
 
 
Flexible Lighting Protection System 0Flexible Lighting Protection System 1Flexible Lighting Protection System 2Flexible Lighting Protection System 3