• Hunan Heou Engineering Consulting Co., Ltd
    Marshall Law
    Thank you for helping us to complete our lightning protection grounding work, our wind power project found several lightning protection companies can not complete, your flexible grounding body is really amazing, thanks again!" .
  • Hunan Heou Engineering Consulting Co., Ltd
    john wick
    Thank you for your assistance in completing the tower lightning protection project. Your company's service is very considerate and technologically advanced, especially the flexible grounding body earthing project, which greatly reduces our cost and time, and I hope to have the opportunity to cooperate again.
Contact Person : cody
Phone Number : 86-17349642793
Whatsapp : +8617349642793

Resistance Reducing Ground Enhancement Material Electrode Barrier Reducing Age

Place of Origin China
Brand Name HAMMOND
Certification ISO9001
Model Number HD-R10Y
Minimum Order Quantity Negotiable
Price Negotiable
Delivery Time 8 days
Payment Terms L/C, T/T
Supply Ability 1000

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Product Name Flexible Grounding Electrode Material Flexible Material
Function Lighting Protection Product Keywords Blocking Agent,Flexible Grounding Body,Resistance Reduction Materials
CERTIFICATE ISO9001 / CE Weight 1kg
High Light

Ground Enhancement Material Electrode

,

CE Resistance Reducing Ground Enhancement Material

,

Barrier Reducing Age Ground Electrode

Leave a Message
Product Description

Trial Pack Independently Develop Resistance Reducing Effect Exactly Grounding Electrode New Type Of Barrier-Reducing Age

Construction of flexible grounding body

 

(1) Flexible grounding body is a kind of compound formula product. It includes: conductive agent, preservative, blending agent, flexibility agent, channel agent, coagulant, catalyst, etc.

 

(2) First dig the grounding trench, weld the horizontal grounding body, and the vertical grounding electrode.

 

(3) Open the lid of the barrel and take off the two bags of raw materials stuck to the inner lid.

 

(4) Open the plastic bag and turn the plastic bag over to the outside of the barrel with a wooden stick into the barrel to stir the sediment and liquid. (When the temperature is low, you should use a heating rod to warm up the liquid in the barrel to about 30 degrees)

 

(5) Open the two external bags of raw materials and add them to the liquid and stir well, and take them to the edge of the ditch, or the pit, to be used.

 

(6) As vertical pouring can be poured directly.

 

(7) If you do horizontal pouring, you need to keep stirring slowly until the resistance of the liquid in the barrel increases and becomes sticky like porridge, then pour it into the trench to wrap the horizontal grounding body and form a long line of pouring while pouring.

 

(8) wait for its solidification to form with elastic grounding conductor, at this time will no longer dissolve in water, can be backfilled, the construction of flexible Hunan Hertz-Ohm Engineering Group Co., Ltd. 4 grounding body thus ended

 

(9) Backfill the grounding trench, and clean up the site garbage, measure the qualified can record the results and then leave the site

 

 

Resistance Reducing Ground Enhancement Material Electrode Barrier Reducing Age 0Resistance Reducing Ground Enhancement Material Electrode Barrier Reducing Age 1Resistance Reducing Ground Enhancement Material Electrode Barrier Reducing Age 2Resistance Reducing Ground Enhancement Material Electrode Barrier Reducing Age 3